110 E Broward Blvd has 3 Fort Lauderdale code-enforcement record(s) on file β 0 not closed and 0 with a lien β plus 266 building permit(s). Compliance Record Score: 91/100 (grade A, Clean record). Public records, provided as-is.
Compliance Record Score: 91/100 β Clean record
A transparent summary of this propertyβs Fort Lauderdale code-enforcement record. Higher is a cleaner record. How this is calculated β
- β’ 3 closed cases
Code-violation history
| Date | Violation | Status | Last activity |
|---|---|---|---|
| Oct 23, 2018 | Code case | Closed | PS |
| May 24, 2016 | Code case | Closed | DISC |
| Dec 2, 2015 | Code case | Closed | EXP PERMIT |
Building-permit history
Showing the 200 most recent of 266 permits.
| Issued | Type / description | Status | Est. value | Contractor |
|---|---|---|---|---|
| Mar 9, 2026 | Address Verification Β· Address Request - New or Alternate | Complete | β | β |
| Mar 6, 2026 | Inspection Document Submittal Β· Inspection Document Submittal | Complete | β | β |
| Feb 27, 2026 | Revision Β· Plan Revision | Complete | β | MASTER MECHANICAL SERVICES INC |
| Jan 22, 2026 | Address Verification Β· Address Request - New or Alternate | Complete | β | β |
| Jan 13, 2026 | Revision Β· Plan Revision | Complete | β | MASTER MECHANICAL SERVICES INC |
| Jan 5, 2026 | Revision Β· Plan Revision | Complete | β | MASTER MECHANICAL SERVICES INC |
| Jan 5, 2026 | Revision Β· Plan Revision | Complete | β | MAX EFFORT BUILDERS INC |
| Dec 19, 2025 | CO Submittal Β· CO Application - Commercial Permit | CO Packet Submittal Pending | β | MAX EFFORT BUILDERS INC |
| Dec 4, 2025 | CO Submittal Β· Certificate of Completion Application | Complete | β | FINE LINE CONSTRUCTION CONTRACTORS INC |
| Nov 24, 2025 | Address Verification Β· Address Request - New or Alternate | Complete | β | β |
| Oct 27, 2025 | General Β· Mechanical Permit | Issued | β | MASTER MECHANICAL SERVICES INC |
| Oct 27, 2025 | General Β· Plumbing Permit | Issued | β | PINNACLE PLUMBING INC |
| Oct 27, 2025 | General Β· Electrical Permit | Void | β | PURSUIT ELECTRICAL INC |
| Oct 17, 2025 | Inspection Document Submittal Β· Inspection Document Submittal | Complete | β | β |
| Oct 17, 2025 | Inspection Document Submittal Β· Inspection Document Submittal | Complete | β | β |
| Oct 16, 2025 | Inspection Document Submittal Β· Inspection Document Submittal | Complete | β | β |
| Oct 16, 2025 | Inspection Document Submittal Β· Inspection Document Submittal | Complete | β | β |
| Oct 15, 2025 | Inspection Document Submittal Β· Inspection Document Submittal | Open | β | β |
| Oct 2, 2025 | General Β· Electrical Subpermit | Issued | β | PURSUIT ELECTRICAL INC |
| Sep 25, 2025 | Address Verification Β· Address Request - New or Alternate | Complete | β | β |
| Sep 25, 2025 | General Β· Structural Permit | Issued | β | MAX EFFORT BUILDERS INC |
| Sep 12, 2025 | Revision Β· Plan Revision | Revision Submitted | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| Sep 12, 2025 | Revision Β· Plan Revision | In Process | β | β |
| Sep 12, 2025 | Revision Β· Plan Revision | In Process | β | β |
| Sep 12, 2025 | Revision Β· Plan Revision | In Process | β | β |
| Sep 12, 2025 | Revision Β· Plan Revision | In Process | β | β |
| Jun 30, 2025 | Revision Β· Plan Revision | Complete | β | NOVEL ENTERPRISES LLC |
| Jun 5, 2025 | Revision Β· Plan Revision | Complete | β | PINNACLE PLUMBING INC |
| May 28, 2025 | Change of Contractor Β· Change of Contractor (Online Submittal) | Complete | β | β |
| May 19, 2025 | Inspection Document Submittal Β· Inspection Document Submittal | Complete | β | β |
| May 19, 2025 | Inspection Document Submittal Β· Inspection Document Submittal | Complete | β | β |
| May 19, 2025 | Inspection Document Submittal Β· Inspection Document Submittal | Complete | β | β |
| May 19, 2025 | Inspection Document Submittal Β· Inspection Document Submittal | Complete | β | β |
| May 19, 2025 | Inspection Document Submittal Β· Inspection Document Submittal | Complete | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| May 19, 2025 | Inspection Document Submittal Β· Inspection Document Submittal | Complete | β | β |
| May 19, 2025 | Change of Contractor Β· Change of Contractor (Online Submittal) | Complete | β | WAVE ELECTRICAL LLC |
| May 18, 2025 | Deferred Submittal Β· Deferred Submittal (Electronic Document Submittal) | Void | β | β |
| May 18, 2025 | Revision Β· Plan Revision | Complete | β | COOLTRACE INTERNATIONAL CORP |
| May 18, 2025 | Deferred Submittal Β· Deferred Submittal (Electronic Document Submittal) | Void | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| May 18, 2025 | Revision Β· Plan Revision | Complete | β | COOLTRACE INTERNATIONAL CORP |
| May 18, 2025 | Revision Β· Plan Revision | Complete | β | COOLTRACE INTERNATIONAL CORP |
| May 18, 2025 | Deferred Submittal Β· Deferred Submittal (Electronic Document Submittal) | Void | β | β |
| May 18, 2025 | Revision Β· Plan Revision | Complete | β | COOLTRACE INTERNATIONAL CORP |
| May 18, 2025 | Deferred Submittal Β· Deferred Submittal (Electronic Document Submittal) | Void | β | β |
| May 18, 2025 | Revision Β· Plan Revision | Complete | β | COOLTRACE INTERNATIONAL CORP |
| May 18, 2025 | Revision Β· Plan Revision | Complete | β | COOLTRACE INTERNATIONAL CORP |
| May 18, 2025 | Deferred Submittal Β· Deferred Submittal (Electronic Document Submittal) | Void | β | β |
| May 18, 2025 | Deferred Submittal Β· Deferred Submittal (Electronic Document Submittal) | Void | β | β |
| Apr 23, 2025 | Revision Β· Plan Revision | Complete | β | FINE LINE CONSTRUCTION CONTRACTORS INC |
| Apr 23, 2025 | Revision Β· Plan Revision | Complete | β | RAY OF LIGHT ELECTRIC INC |
| Apr 23, 2025 | Revision Β· Plan Revision | Complete | β | PINNACLE PLUMBING INC |
| Apr 8, 2025 | Revision Β· Plan Revision | Complete | β | PURSUIT ELECTRICAL INC |
| Apr 8, 2025 | Revision Β· Plan Revision | Complete | β | β |
| Apr 8, 2025 | Revision Β· Plan Revision | Complete | β | COOLTRACE INTERNATIONAL CORP |
| Apr 8, 2025 | Revision Β· Plan Revision | Complete | β | A PLUS PLUMBING CORP DBA STEVE ROTHENBERG PLUMBING CORP |
| Mar 4, 2025 | Revision Β· Plan Revision | Void | β | β |
| Feb 26, 2025 | Revision Β· Plan Revision | Complete | β | MASTER MECHANICAL SERVICES INC |
| Feb 26, 2025 | Revision Β· Plan Revision | Complete | β | FINE LINE CONSTRUCTION CONTRACTORS INC |
| Feb 26, 2025 | Revision Β· Plan Revision | Complete | β | PINNACLE PLUMBING INC |
| Feb 26, 2025 | Revision Β· Plan Revision | Complete | β | RAY OF LIGHT ELECTRIC INC |
| Feb 18, 2025 | Change of Contractor Β· Change of Contractor (Online Submittal) | Awaiting Client Reply | β | BASS UNITED FIRE & SECURITY SYSTEMS INC |
| Feb 17, 2025 | Revision Β· Plan Revision | Complete | β | β |
| Feb 3, 2025 | General Β· Electrical Permit | Complete | β | β |
| Jan 29, 2025 | Fire Β· Fire Permit | Issued | β | RBK FIRE SYSTEMS INC |
| Jan 27, 2025 | General Β· Plumbing Permit | Complete | β | A PLUS PLUMBING CORP DBA STEVE ROTHENBERG PLUMBING CORP |
| Jan 27, 2025 | General Β· Mechanical Permit | Issued | β | MASTER MECHANICAL SERVICES INC |
| Jan 27, 2025 | General Β· Plumbing Permit | Void | β | A PLUS PLUMBING CORP DBA STEVE ROTHENBERG PLUMBING CORP |
| Jan 27, 2025 | General Β· Plumbing Permit | Complete | β | A PLUS PLUMBING CORP DBA STEVE ROTHENBERG PLUMBING CORP |
| Jan 27, 2025 | Fire Β· Fire Permit | Complete | β | BASS UNITED FIRE & SECURITY SYSTEMS INC |
| Jan 27, 2025 | Revision Β· Plan Revision | Complete | β | WIGINTON CORPORATION DBA WIGINTON FIRE SYSTEMS |
| Jan 27, 2025 | General Β· Plumbing Permit | Complete | β | A PLUS PLUMBING CORP DBA STEVE ROTHENBERG PLUMBING CORP |
| Jan 27, 2025 | General Β· Electrical Permit | Issued | β | β |
| Jan 27, 2025 | General Β· Plumbing Permit | Complete | β | A PLUS PLUMBING CORP DBA STEVE ROTHENBERG PLUMBING CORP |
| Jan 27, 2025 | General Β· Plumbing Permit | Complete | β | A PLUS PLUMBING CORP DBA STEVE ROTHENBERG PLUMBING CORP |
| Jan 27, 2025 | General Β· Plumbing Permit | Issued | β | PINNACLE PLUMBING INC |
| Jan 27, 2025 | Change of Contractor Β· Change of Contractor (Online Submittal) | Complete | β | FINE LINE CONSTRUCTION CONTRACTORS INC |
| Jan 27, 2025 | General Β· Plumbing Permit | Complete | β | A PLUS PLUMBING CORP DBA STEVE ROTHENBERG PLUMBING CORP |
| Jan 23, 2025 | Address Verification Β· Address Request - New or Alternate | Complete | β | β |
| Jan 22, 2025 | Revision Β· Plan Revision | Complete | β | β |
| Jan 21, 2025 | Fire Β· Fire Permit | Complete | β | BASS UNITED FIRE & SECURITY SYSTEMS INC |
| Jan 21, 2025 | Fire Β· Fire Permit | Complete | β | BASS UNITED FIRE & SECURITY SYSTEMS INC |
| Jan 21, 2025 | Fire Β· Fire Permit | Complete | β | BASS UNITED FIRE & SECURITY SYSTEMS INC |
| Jan 21, 2025 | Fire Β· Fire Permit | Complete | β | BASS UNITED FIRE & SECURITY SYSTEMS INC |
| Jan 21, 2025 | Fire Β· Fire Permit | Complete | β | BASS UNITED FIRE & SECURITY SYSTEMS INC |
| Jan 21, 2025 | Fire Β· Fire Permit | Complete | β | BASS UNITED FIRE & SECURITY SYSTEMS INC |
| Jan 21, 2025 | Fire Β· Fire Permit | Void | β | BASS UNITED FIRE & SECURITY SYSTEMS INC |
| Jan 17, 2025 | General Β· Mechanical Permit | Complete | β | COOLTRACE INTERNATIONAL CORP |
| Jan 17, 2025 | General Β· Mechanical Permit | Complete | β | COOLTRACE INTERNATIONAL CORP |
| Jan 17, 2025 | General Β· Mechanical Permit | Complete | β | COOLTRACE INTERNATIONAL CORP |
| Jan 17, 2025 | General Β· Mechanical Permit | Void | β | COOLTRACE INTERNATIONAL CORP |
| Jan 17, 2025 | Fire Β· Fire Permit | Complete | β | NOVEL ENTERPRISES LLC |
| Jan 17, 2025 | General Β· Mechanical Permit | Complete | β | COOLTRACE INTERNATIONAL CORP |
| Jan 17, 2025 | General Β· Mechanical Permit | Complete | β | COOLTRACE INTERNATIONAL CORP |
| Jan 17, 2025 | General Β· Electrical Permit | Issued | β | PURSUIT ELECTRICAL INC |
| Jan 17, 2025 | General Β· Electrical Permit | Issued | β | PURSUIT ELECTRICAL INC |
| Jan 17, 2025 | General Β· Electrical Permit | Issued | β | PURSUIT ELECTRICAL INC |
| Jan 17, 2025 | General Β· Electrical Permit | Issued | β | PURSUIT ELECTRICAL INC |
| Jan 17, 2025 | General Β· Electrical Permit | Issued | β | PURSUIT ELECTRICAL INC |
| Jan 17, 2025 | Fire Β· Fire Permit | Issued | β | NOVEL ENTERPRISES LLC |
| Jan 17, 2025 | Fire Β· Fire Permit | Void | β | NOVEL ENTERPRISES LLC |
| Jan 17, 2025 | Fire Β· Fire Permit | Complete | β | NOVEL ENTERPRISES LLC |
| Jan 17, 2025 | Fire Β· Fire Permit | Complete | β | NOVEL ENTERPRISES LLC |
| Jan 17, 2025 | Fire Β· Fire Permit | Complete | β | NOVEL ENTERPRISES LLC |
| Jan 17, 2025 | Fire Β· Fire Permit | Complete | β | NOVEL ENTERPRISES LLC |
| Jan 17, 2025 | General Β· Electrical Permit | Void | β | PURSUIT ELECTRICAL INC |
| Jan 17, 2025 | General Β· Mechanical Permit | Complete | β | COOLTRACE INTERNATIONAL CORP |
| Jan 17, 2025 | General Β· Electrical Permit | Issued | β | PURSUIT ELECTRICAL INC |
| Jan 16, 2025 | Change of Contractor Β· Change of Contractor (Online Submittal) | Complete | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| Jan 16, 2025 | Change of Contractor Β· Change of Contractor (Online Submittal) | Complete | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| Jan 16, 2025 | Change of Contractor Β· Change of Contractor (Online Submittal) | Complete | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| Jan 16, 2025 | Change of Contractor Β· Change of Contractor (Online Submittal) | Complete | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| Jan 16, 2025 | Change of Contractor Β· Change of Contractor (Online Submittal) | Complete | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| Jan 16, 2025 | Change of Contractor Β· Change of Contractor (Online Submittal) | Complete | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| Jan 16, 2025 | Change of Contractor Β· Change of Contractor (Online Submittal) | Complete | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| Jan 15, 2025 | General Β· Structural Permit | Complete | β | β |
| Jan 8, 2025 | Fire Β· Fire Permit | Issued | β | BASS UNITED FIRE & SECURITY SYSTEMS INC |
| Jan 6, 2025 | General Β· Mechanical Permit | Issued | β | MASTER MECHANICAL SERVICES INC |
| Jan 5, 2025 | General Β· Plumbing Permit | Issued | β | PINNACLE PLUMBING INC |
| Jan 5, 2025 | Change of Contractor Β· Change of Contractor (Online Submittal) | Complete | β | FINE LINE CONSTRUCTION CONTRACTORS INC |
| Jan 5, 2025 | Fire Β· Fire Permit | Issued | β | RBK FIRE SYSTEMS INC |
| Jan 5, 2025 | General Β· Electrical Permit | Issued | β | RAY OF LIGHT ELECTRIC INC |
| Nov 13, 2024 | General Β· Structural Permit | Issued | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| Nov 13, 2024 | General Β· Structural Permit | Issued | β | β |
| Nov 13, 2024 | General Β· Structural Permit | Issued | β | β |
| Nov 13, 2024 | General Β· Structural Permit | Void | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| Nov 13, 2024 | General Β· Structural Permit | Issued | β | β |
| Nov 13, 2024 | General Β· Structural Permit | Issued | β | β |
| Nov 13, 2024 | General Β· Structural Permit | Issued | β | β |
| Nov 11, 2024 | General Β· Structural Permit | Issued | β | FINE LINE CONSTRUCTION CONTRACTORS INC |
| Nov 10, 2024 | General Β· Structural Permit | Issued | β | FINE LINE CONSTRUCTION CONTRACTORS INC |
| Sep 24, 2024 | Revision Β· Plan Revision | In Process | β | WEATHERMAKERS A/C CONTRACTORS INC |
| Sep 24, 2024 | Revision Β· Plan Revision | In Process | β | WEATHERMAKERS A/C CONTRACTORS INC |
| Sep 24, 2024 | Revision Β· Plan Revision | In Process | β | WEATHERMAKERS A/C CONTRACTORS INC |
| Sep 24, 2024 | Revision Β· Plan Revision | In Process | β | β |
| Sep 24, 2024 | Revision Β· Plan Revision | In Process | β | WEATHERMAKERS A/C CONTRACTORS INC |
| Sep 6, 2024 | Revision Β· Plan Revision | Revision Submitted | β | BLUEWATER BUILDERS GROUP INC |
| Aug 30, 2024 | General Β· Electrical Permit | Complete | β | NCT CORPORATION |
| Aug 26, 2024 | Deferred Submittal Β· Deferred Submittal (Electronic Document Submittal) | Document Submitted | β | BLUEWATER BUILDERS GROUP INC |
| Aug 19, 2024 | Revision Β· Plan Revision | Revision Submitted | β | β |
| Aug 13, 2024 | Revision Β· Plan Revision | Open | β | β |
| Aug 9, 2024 | Revision Β· Plan Revision | Revision Submitted | β | OASIS MECHANICAL LLC |
| Aug 9, 2024 | Revision Β· Plan Revision | Revision Submitted | β | JRM CONSTRUCTION MANAGEMENT FLORIDA LLC |
| Aug 9, 2024 | Revision Β· Plan Revision | Revision Submitted | β | PURSUIT ELECTRICAL INC |
| Jul 19, 2024 | Revision Β· Plan Revision | In Process | β | ALL OUT AIR CONDITIONING LLC |
| Jul 19, 2024 | Revision Β· Plan Revision | In Process | β | β |
| Jul 19, 2024 | Revision Β· Plan Revision | In Process | β | PURSUIT ELECTRICAL INC |
| Jul 18, 2024 | Change of Contractor Β· Change of Contractor (POST-ISSUANCE ONLY) | Open | β | SUMMA MECHANICAL CONTRACTORS LLC DBA SMC AIR CONDITIONING |
| Jul 17, 2024 | Revision Β· Plan Revision | In Process | β | OASIS MECHANICAL LLC |
| Jul 17, 2024 | Revision Β· Plan Revision | Revision Submitted | β | β |
| Jul 17, 2024 | Revision Β· Plan Revision | In Process | β | OASIS MECHANICAL LLC |
| Jul 17, 2024 | Revision Β· Plan Revision | In Process | β | OASIS MECHANICAL LLC |
| Jul 17, 2024 | Revision Β· Plan Revision | In Process | β | OASIS MECHANICAL LLC |
| Jul 17, 2024 | Revision Β· Plan Revision | In Process | β | OASIS MECHANICAL LLC |
| Jul 17, 2024 | Revision Β· Plan Revision | In Process | β | OASIS MECHANICAL LLC |
| Jul 17, 2024 | Revision Β· Plan Revision | Revision Submitted | β | β |
| Jul 17, 2024 | Revision Β· Plan Revision | In Process | β | OASIS MECHANICAL LLC |
| Jul 16, 2024 | Revision Β· Plan Revision | Open | β | EAGLE PLUMBING INC |
| Jul 16, 2024 | Revision Β· Plan Revision | In Process | β | LEVCON BUILDERS LLC |
| Jul 16, 2024 | Revision Β· Plan Revision | In Process | β | LEVCON BUILDERS LLC |
| Jul 16, 2024 | Revision Β· Plan Revision | In Process | β | EAGLE PLUMBING INC |
| Jul 16, 2024 | Revision Β· Plan Revision | In Process | β | LEVCON BUILDERS LLC |
| Jul 16, 2024 | Revision Β· Plan Revision | In Process | β | EAGLE PLUMBING INC |
| Jul 16, 2024 | Revision Β· Plan Revision | In Process | β | LEVCON BUILDERS LLC |
| Jul 16, 2024 | Revision Β· Plan Revision | In Process | β | EAGLE PLUMBING INC |
| Jun 21, 2024 | Revision Β· Plan Revision | Revision Submitted | β | β |
| Jun 21, 2024 | Revision Β· Plan Revision | Revision Submitted | β | β |
| Jun 20, 2024 | Change of Contractor Β· Change of Contractor (PRE-ISSUANCE ONLY) | Open | β | BLUEWATER BUILDERS GROUP INC DBA BLUEWATER BUILDERS CONSTRUCTION SERVICES LLC |
| Jun 18, 2024 | Change of Contractor Β· Change of Contractor (PRE-ISSUANCE ONLY) | Open | β | PINNACLE PLUMBING INC |
| Jun 18, 2024 | Change of Contractor Β· Change of Contractor (PRE-ISSUANCE ONLY) | Open | β | ALL OUT AIR CONDITIONING LLC |
| Jun 18, 2024 | Change of Contractor Β· Change of Contractor (PRE-ISSUANCE ONLY) | Open | β | BASS UNITED FIRE & SECURITY SYSTEMS INC |
| Jun 11, 2024 | General Β· Electrical Permit | Complete | β | PURSUIT ELECTRICAL INC |
| Jun 11, 2024 | Fire Β· Fire Permit | Complete | β | WIGINTON CORPORATION DBA WIGINTON FIRE SYSTEMS |
| Jun 11, 2024 | General Β· Mechanical Permit | Complete | β | β |
| Jun 11, 2024 | Fire Β· Fire Permit | Complete | β | BASS UNITED FIRE & SECURITY SYSTEMS INC |
| Jun 11, 2024 | General Β· Plumbing Permit | Complete | β | TRV SOUTH LLC |
| May 17, 2024 | Change of Contractor Β· Change of Contractor (PRE-ISSUANCE ONLY) | Open | β | TRI COUNTY ELECTRICAL SERVICES INC |
| May 15, 2024 | Change of Contractor Β· Change of Contractor (PRE-ISSUANCE ONLY) | Unknown | β | TRI COUNTY ELECTRICAL SERVICES INC |
| Apr 19, 2024 | Fire Β· Fire Permit | Open | β | TO BE DETERMINED |
| Apr 19, 2024 | Fire Β· Fire Permit | Open | β | TO BE DETERMINED |
| Apr 18, 2024 | General Β· Mechanical Permit | Complete | β | β |
| Apr 18, 2024 | General Β· Electrical Permit | Complete | β | β |
| Apr 18, 2024 | Fire Β· Fire Permit | Unknown | β | TO BE DETERMINED |
| Apr 18, 2024 | General Β· Plumbing Permit | Complete | β | PINNACLE PLUMBING INC |
| Apr 15, 2024 | Fire Β· Fire Permit | Complete | β | NOVEL ENTERPRISES LLC |
| Apr 15, 2024 | Fire Β· Fire Permit | Complete | β | NOVEL ENTERPRISES LLC |
| Apr 15, 2024 | Fire Β· Fire Permit | Complete | β | NOVEL ENTERPRISES LLC |
| Apr 15, 2024 | Fire Β· Fire Permit | Complete | β | NOVEL ENTERPRISES LLC |
| Apr 11, 2024 | Fire Β· Fire Permit | Complete | β | β |
| Apr 11, 2024 | Fire Β· Fire Permit | Complete | β | β |
| Apr 11, 2024 | Fire Β· Fire Permit | Pending Master Corrections | β | β |
| Apr 9, 2024 | Fire Β· Fire Permit | Complete | β | β |
| Apr 9, 2024 | Fire Β· Fire Permit | About to Expire | β | β |
| Apr 9, 2024 | Fire Β· Fire Permit | Void | β | β |
| Apr 9, 2024 | Fire Β· Fire Permit | Complete | β | β |
| Apr 9, 2024 | Fire Β· Fire Permit | About to Expire | β | β |
| Apr 9, 2024 | Fire Β· Fire Permit | Complete | β | β |
| Apr 8, 2024 | Fire Β· Fire Permit | Complete | β | β |
| Apr 8, 2024 | Fire Β· Fire Permit | Complete | β | β |
| Apr 8, 2024 | Fire Β· Fire Permit | Void | β | β |
| Apr 8, 2024 | Fire Β· Fire Permit | About to Expire | β | β |
More Fort Lauderdale property records
β All Fort Lauderdale records
Sources & verify
This page reproduces public records as-is. Check the originals at the official source:
- π Official code records for this address β City of Fort Lauderdale GIS
- ποΈ Official permit records for this address β City of Fort Lauderdale GIS
- ποΈ Open the City of Fort Lauderdale GIS data portal
See a problem with this record?
These are public records shown as-is. If something is wrong, mismatched to this address, or should be removed, tell us and weβll review it in good faith.
Report a correction or removal